14 - REFIT HISTORY |
REFIT 2016 / 2017 |
· A/C Compressor 2 been changed for a complete new unit. August 2016 |
· Air handlers complete rebuild incl. Motors, Fans, Ducting, insolation. New heat elements installed. |
· Most hull anodes changed recently. February 2017 |
· A/V system 2 new TVRO Seatel 100 antennas installed. February 2017 |
· Toilet pumps 2 new JETS pump installed to replace EVAC system. February 2017 |
· Hamann full rebuild incl. Valves replaced and spare pumps rebuild. January 2017 |
· New emergency fire generator installed. March 2017 |
· Galley / Laundry extractor ducting and motors cleaned. January 2017 |
· Gangway complete overhaul and painted. February 2017 |
· Generators major service by Pon Power incl. change of both sump gaskets. December 2016 |
· Main engines service by Pon Power. January 2017 |
· Grey water tanks cleaned and painted. February 2017 |
· Hull and Tanks thickness measurements completed by Testia. February / March 2017 |
· All Miele equipment serviced. January 2017 |
· Main engines shaft seals and oil changed. February 2017 |
|
|
WORKS APRIL 2015 |
· Replaced and upgraded all electronic boards of the control and synchronization system for the generators |
|
|
REFIT 2013 / 2014 |
· Complete repaint of the vessel, including new colour scheme. Hull Dark Grey, Superstructure in Matterhorn White, detail of the recessed window mullions and waterline in Graphite Grey |
· The deckheads were also repainted in satin white. During the repaint, the whole transom was sandblasted and re-finished from bare steel. Also, the whole underwater area of the vessel was sandblasted to bare steel and a complete new epoxy and antifoul system from Jotun was applied |
· A new hull tank was fitted (black water) and relevant additional pipe works. |
· The teak decks were fully re-caulked in a new grey colour to match the new paint scheme |
· The two overhead tender cranes were serviced and upgraded to spectra and have new winch cages fitted |
· The zero speed stabilizers have been completely overhauled |
· Both of the Reintjes main propulsion gearboxes were removed, overhauled and replaced |
· The ducting and ventilation fans in the engine room have been completely replaced with a stainless steel version |
· The air-conditioning and fridge/freeze plants have been mechanically serviced and the air-conditioning upgraded. All Freeze/cool room pipe work has been completely replaced with new valves, etc. also installed |
· The fiberglass mast has been worked on to accommodate a new antennae in a seemly way with new platforms built from composite |
· The windlass was overhauled by the manufacturer Steen and both the anchor chains were replaced with new |
· A new higher windscreen rail and polycarbonate windscreen has been installed to give greater protection around the Jacuzzi on the sundeck |
· All fire extinguishers aboard have been replaced |
· Silver ion fresh water sterilizer |
· A new sub-zero fridge was fitted to the aft deck of the vessel |
· Both Castoldi 23 tenders were returned to Castoldi for the painting of the hull to match the vessel and to change the tubes to grey to better suit the new look |
· Whilst with Castoldi, both tenders had engine services and jet drives serviced |
· All exterior cushion fabric replaced in a light/silver grey to compliment the new colour scheme of the yacht |
· In the bridge- new Doppler log and depth sounders fitted from Furuno, with log and Depth from B&G fitted as a back-up, also B&G processor upgraded to Hydra 3000. 2 x new Furuno |
· GPS units replace the old Leica ones |
· Pon Power have also been aboard and serviced the generator engines with special attention to the governors and fuel pumps |
|
|
MARCH 2011 WORKS |
· Main engines "top end overhaul" completed with successful sea |
Trials, work was done by Pon Power of the Netherlands |
· All fuel tanks, black and grey tanks have been cleaned |
· A complete service of the Air Conditioning system and the control |
and monitoring electrics were replaced. The Gas used has been upgraded and also on the Freeze/Chill room system |
|
|
2010 (APRIL) REFIT |
· Both generators zero houred/ overhauled |
· Galley and Laundry refurbishment and replacement of all appliances |
· New fabrics throughout the interior (all carpets, head lining, head |
boards, deck heads) |
· New sofas and chairs in both salons |
· All batteries (service and engines) replaced with new ones |
|
|
2006 / 2007 |
· Installation of zero speed stabilizers in 2006 |
· Hull paint to bare metal in 2006 (Pinmar MB92) |
· New Propellers in 2007 (two spare) |
· Gantries and gangway serviced with new cables in 2009 |